Thursday, 1 November 2012

Extension of time to file ITR-V for AY 2010-11 and 2011-12

Extension of time to file ITR-V for AY 2010-11 and 2011-12

PRESS RELEASE

INCOME TAX DEPARTMENT

The Director General of Income Tax (System) as per powers assigned to it under clause (ii) of Para 14 read with clause (7) of Para 4 of the 'Centralized Processing of Returns Scheme, 2011′, issued as per C B D T Notification No. SO 16(E) dated 4.1.2012, has decided to extend the time limit for filing ITR-V forms relating to Income Tax Returns filed electronically (without digital signature Certificate) for A.Y. 2010-11 (filed during F.Y. 2011-12) and for A.Y. 2011-12 (filed on or after 1st April, 2011). These ITR-V forms can now be filed upto 31st December, 2012 or within a period of 120 days from the date of uploading of the electronic return data, whichever is later.

2. The Relaxation has been made since there are still a large number of electronic returns relating to A.Y. 2011-12 which had been filed on or before due date but for which the ITR-V forms have not yet been received at the Centralized Processing Centre (CPC), Bengaluru. These taxpayers are being given an opportunity to send ITR-V forms to the CPC, Bengaluru by the date mentioned in para 1 above.

3. Taxpayers can also verify their status of receipt of ITR-V at e-filing website https://incometaxindiaefiling.gov.in. They can also download the ITR-V from the same website from sub-menu My Return under main-menu of My account after login into above mentioned website.

4. The ITR-V forms should be sent by ordinary post or speed post addressed to CPC,

Post Bag No.1, Electronic City Post Office, Bengaluru-560100.

———————————————-

Related notification is as follows :-

F.No. DIT(S)-III/ITR-V Extension/ 2012-13
Government of India
Ministry of Finance
Department of Revenue
Central Board of Direct Taxes
Directorate General of Income Tax (Systems), New Delhi.

Notification NO. 01/2012 under CPR Scheme 2011

Dated 23rd October, 2012

Subject: Extension of time limit for filing ITR-V forms for A.Y. 10-11 and A.Y. 2011-12

In exercise of its powers under clause (ii) of Para 14 read with clause (7) of Para 4 of the 'Centralized Processing of Returns Scheme, 2011′, issued vide CBDT Notification No. SO 16(E) dated 4.1.2012, the Director General of Income Tax (System) hereby extends the time limit for filing ITR-V forms relating to Income Tax Returns filed electronically (without digital signature Certificate) for A.Y. 2010-11 (filed during F.Y. 2011-12) and for A.Y. 2011-12 (filed on or after 1st April, 2011). These ITR-V forms can now be filed upto 31st December, 2012 or within a period of 120 days from the date of uploading of the electronic return data, whichever is later. This direction is issued to mitigate the hardship and grievance of the tax payers who have been prevented by reasonable causes to file the ITR-V in time.

Sd/-

(RANI SINGH NAIR)

Director General of Income Tax (Systems)


http://taxguru.in/income-tax/extension-time-file-itrv-ay-201011-201112.html

4 comments:

  1. [url=http://freewebs.com/nvcb/apps/profile/101737854/][IMG]http://maximalblog.net/AZIPICS/AZIPICS_00142.jpg[/IMG][/url]

    [b]Azithromycin 500 mg online[/b]

    [url=http://freewebs.com/washingtonfeatherfanciers/apps/profile/86418920/]Single dose zithromax chlamydia[/url]

    [b]Buy generic zithromax online no prescription[/b]

    [url=http://freewebs.com/misshamptonbeach/apps/profile/86418920/]Buy azithromycin online usa[/url]

    The prescription antibiotic Zithromax is commonly employed to treat various common infections, as an example bacterial infections and venereal disease. By decreasing bacteria's ability in order to make protein and affecting peptide activity, the medicine might actually help stop bacteria from continuing to live a life and cause infection in the human body. Zithromax enters in either tablet form or when you're a liquid suspension as well as licensed to be utilized in both adults and children.

    ReplyDelete
  2. [url=http://freewebs.com/clarebatgroup/apps/profile/101737854/][IMG]http://favoritepillstore.com/zithromax/2012-05-07_00268.jpg[/IMG][/url] [url=http://freewebs.com/danielaandres/apps/profile/101737854/][IMG]http://favoritepillstore.com/zithromax/AzithromycinPics_00023.jpg[/IMG][/url]

    [b]Can u buy zithromax over the counter[/b], [b]where to buy z-pack antibiotic[/b], [b]azithromycin online no prescription![/b]

    [url=http://freewebs.com/noilluminati/apps/profile/101737854/]Where to buy a z pack[/url]

    [url=http://freewebs.com/cugoinglocal/apps/profile/86418920/]Buy azithromycin 500 mg online[/url]

    [url=http://freewebs.com/stpaulswenona/apps/profile/86418920/]Azithromycin buy online no prescription uk[/url]

    The prescription antibiotic Zithromax is used to treat various common infections, just like for example bacterial infections and social disease. By decreasing bacteria's ability to bring about protein and affecting peptide activity, the medicine may also help stop bacteria from continuing to call home and cause infection contained in the body. Zithromax can be purchased in either tablet form or as a liquid suspension it truly is licensed to be used in both adults and children.

    ReplyDelete
  3. [url=http://freewebs.com/toroscr/apps/profile/101737854/][IMG]http://favoritepillstore.com/zithromax/AZIPICS_00215.jpg[/IMG][/url]

    [url=http://freewebs.com/bjohnr/apps/profile/101737854/]Buy zithromax 250mg[/url]



    [url=http://freewebs.com/cermc/apps/profile/101737854/]Azithromycin for sale no prescription[/url]

    Zithromax (azithromycin) is an accomplished component coming from the classification of drugs called macrolide anti-biotics. Zithromax fights bacteria while in the childs body.
    Zithromax can feel dealing with diverse a variety of difficulties a result of bacteria, as in inhaling problems, epidermis disease, head difficulties, and venereal illness.
    Zithromax can also be utilized for uses not promoted in script drugs guide.

    ReplyDelete
  4. I really like it whenever people get together and share thoughts.
    Great blog, continue the good work!

    my page :: siria

    ReplyDelete